An enquiry for 'an AC unit' can mean a complete system, indoor equipment, outdoor equipment or a single replacement component. Name the required supply scope explicitly. The project professional should identify the approved equipment combination; the branch then needs the exact references and quantities for the requested items.
Distinguish the assembly from its parts
Copy the manufacturer's equipment name and full model rather than applying a familiar label to every indoor or outdoor assembly. If only a coil, blower, control or compressor is needed, use the component reference and explain that the enquiry is for a part. A price for a complete assembly cannot be compared directly with a price for one component inside it.
Keep matching equipment identified
For a new or approved replacement system, retain the selected indoor and outdoor references together with the specified controls and electrical requirements. Do not infer compatibility from capacity or brand alone. Ask the branch to confirm the actual supply contents and separate accessories, while design and commissioning remain with the qualified project team. At handover, compare labels with the approved schedule before distributing equipment.
A practical enquiry example
Keep separate lines for a complete air-handling assembly and any individually ordered component. This makes it clear whether a supply response concerns the whole unit or only a blower, coil or other replacement part.
Enquiry checklist
- Complete-system, assembly or component scope
- Full equipment and component references
- Approved matching equipment and controls
- Confirmed supply contents and accessories
Does 'AC unit' identify what should be supplied?
Not precisely enough. State whether you need a complete system, an assembly or a component, with the approved model reference.
Discuss your requirement with Refco
Prepare the approved references and quantities, then contact the branch to confirm availability and collection details before visiting.




